CWC Solar Panel System Connection

June 2024

CWC Ltd is pleased to announce that we will be connecting our newly installed 435KW solar panel system to the Hong Kong Electrical Grid on 12-Jun-2024 between 14:00 – 16:00 at our Tuen Mun facility. 

The connection time will take less than an hour.  However, our Tuen Mun office is required to be closed from 14:00 to 16:00.

Wine drop-off and pick up services will not be possible during this period. 

All services will resume back to normal after 16:00. 

Thank you for your patience and understanding during this very important sustainability milestone.